Starting to sound like a broken record but rain, rain and more rain has kept progress to a minimum. There has still been a good deal of work done, but most is unseen. The builder spent about three days setting all the drains and then they had to bring in more gravel. Because the floor is so big, they decided to pour it in three sections
The gravel was brought into the foundation and graded so that the floor is an even four inches. Once that is done, they lay black plastic down with wire mesh and rebar on top. Finally, the cement truck comes in and they pour a section. So far we have two sections done and the final one should be completed tomorrow. The last thing will be to pour cement in the block on the back wall every four feet with rebar per code as reinforcement, then the cap blocks go on. When that is done, hopefully by early next week, we can start on the framing.
Thursday, May 28, 2009